Shreeji Industries - 100 kW Rooftop Solar
Shreeji Industries Pvt Ltd MIDC Satpur, Nashik 28 days on site
A 100 kW rooftop system on an auto-component factory shed, covering roughly three-fourths of the unit's daytime consumption.
100 kW
System capacity
1.46 lakh units
Annual generation
₹9.7 L lower
Monthly bill impact
75%
Bill reduction
What happened to the electricity bill
Figures are this client's actual averages before and after commissioning. Your own result will depend on your tariff, consumption pattern and roof - it will not be identical to this.
The challenge
The shed purlins were spaced wider than standard and the plant could not stop production for even a single shift during installation.
What we did
We ran a structural check first and added intermediate supports where needed, then scheduled all roof work during the Sunday maintenance window across four weekends.
Project notes
Shreeji Industries runs two shifts on a connected load of 250 kVA, with the bulk of consumption between 9 AM and 7 PM. That daytime-heavy profile made the site an almost textbook fit for on-grid solar.
The 100 kW system now generates around 1.46 lakh units a year against an annual consumption of roughly 1.95 lakh units. Monthly bills dropped from an average of Rs 12.85 lakh to Rs 3.15 lakh, and the client claimed 40% accelerated depreciation in the first financial year.